|
Order additional documents from TIC (Technical Information Center)
Please contact TIC to order any additional documents on this page.
**Download Notes - Please note that depending on your internet connection speed, documents with larger file sizes may take longer to open or download.

2009

2008
- South Rim Canyon View Information Plaza & Mather Point Schematic Design Report - June 2008 -
PMIS 115697
- Grand Canyon National Park

2007
- Guide to Sustainable Mountain Trails - September 2007 - D1811
- Trail Assessment, Planning, & Design Sketchbook - 2007 Edition
- Entire Sketchbook, pages 1-164 (PDF **25 MB)
- Front Cover, Table of Contents, Foundations of Mountain Trail Sustainability, Fundamentals of Mountain Trail Sustainability, & Trail Sustainability Assessment sections, pages 1-32 (PDF 4.7 MB)
- Mountain Trail Planning section, pages 33-62 (PDF 4.4 MB)
- Basic Design & New Trail Design sections, pages 63-82 (PDF 3.7 MB)
- Restoration Planning & Mountain Trail Bridges sections, pages 83-100 (PDF 3.2 MB)
- Implementation Techniques & Options sections, pages 101-122 (PDF 4.5 MB)
- Ensuring Mountain Sustainability & Patience Examples sections, pages 123-142 (PDF 3.8 MB)
- Room To Grow, The Trail Ahead, Credits, & Back Cover sections, pages 143-164 (PDF 2.9 MB)
- Stehekin Transportation Study & Landing and Dock Conceptual Design - March 2007 - PMIS 56062
- North Cascades, National Park Service Complex

2006

2005
- Shuttle Bus & Remaining Service Life Study - August 2005 - PMIS 63560
- Alternatives Report - Old Faithful Transportation/Circulation Study - July 2005 - PMIS 63294
- Yellowstone National Park
- Scoping Report, DC Visitor Transportation Study - March 2005 - PMIS 89062A
- National Mall & Memorial Parks

2004
- Data Collection Summary - Old Faithful Transportation/Circulation Study - December 2004 - PMIS 63294
- Yellowstone National Park
- Alternatives Transportation Study - November 2004 - PMIS 63116
- Fort Sumter National Monument

2003
- Initial Data Collection Summary Report -Old Faithful Transportation/Circulation Study - September 2003 - PMIS 63294
- Yellowstone National Park
- Visitor Study - Study Completion Report - August 2003 - PMIS 56073
- Hawaii Volcanoes National Park
- Visitor Transportation Survey - National Capital Parks Central - Washington, DC - November 2003 -
PMIS 89062
- National Mall & Memorial Parks
- Shuttle Implementation Plan & Parking Management Plan - June 2003 - PMIS 63562
- Sequoia & Kings Canyon National Parks
- Visitor and Vehicular Data Collection - December 2003 - D72 - PMIS 56092
- Pinnacles National Monument

2002
- Data Collection & Transportation Conditions Assessment - October 2002- PMIS 56073
- Hawaii Volcanoes National Park
- Lands End Transportation Workshop - August 2002 - PMIS 55854
- Golden Gate National Recreation Area
- Designing Charette & Public Open House - May 2002 - D-63
- Devils Tower National Monument
- Heart-of-the-Park Shuttle Demonstration Project - April 2002 - PMIS 62267
- NPS and California Department of Parks and Recreation
- US 12 Corridor Charette - January & February 2002 - PMIS 063128
- Mount Rainier National Park

2001
- Park & Ride Facility and River Day Use Area - November 2001 - PMIS 60911
- Fort Clatsop National Memorial
- Nisqually Road Corridor Charette - January & April 2001 - PMIS 63007
- Mount Rainier National Park

2000
- Chinook Scenic Byway Charette - September 2000 - PMIS 56083
- Mount Rainier National Park

1998
- Access Issues at Cades Cove - May 1998 - Package no.229-03 D-483
- Great Smoky Mountains National Park

1995
- Zion Canyon Comprehensive Design - August 1995 - D-93
Back to top ^
|