3.0 Design Development

3.1 Prepare Design Development Documents

Based on the Schematic Design, and the Response Memorandum to the DAB review questions, prepare the following:

Guidelines:

Template: Division 1 Specifications


3.2 Initiate Constructability Analysis

Initiate Constructability Analysis utilizing the Constructability Checklist.

Template: Constructability Checklist


3.3. Draft Contract Price Schedule

Prepare a draft Contract Price Schedule utilizing the NPS DSC form.

Guideline: Guide for Specifiers, March 2008 (PDF)

Template: Contract Price Schedule


3.4 Update Class B Construction Cost Estimate

Update the Class B Construction Cost Estimate based on the completed Design Development documents; confirm that project cost is within available funds.


3.5 Design Development Deliverables

 

3.5.1

Submit Draft Design Development Documents

Submit Draft Design Development Documents, Constructability Analysis, Draft Contract Price Schedule and updated Class B Construction Cost Estimate for review.

 
  3.5.2

Resolve Draft Design Development Review Comments

Resolve all review comments. Submit written responses to review comments, utilizing the NPS review form, within 15 calendar days of receipt of comments.


3.6 Compliance Deliverables

 

3.6.1

Compliance Drawings and Supporting Narrative

   
    3.6.1.1

When required, prepare and submit drawings and supporting narrative for SHPO/THPO review and other compliance activities, as required.

Incorporate resolution of SHPO/THPO review comments into Draft Design Development Documents, as required.

   
    3.6.1.2 When required, prepare and submit drawings and supporting narrative for obtaining Section 404, National Pollutant Discharge Elimination system (NPDES), and other permits as required.

Resolve reviewing agencies comments, as required.

 
  3.6.2

Submit FONSI or ROD

When required, submit FONSI or ROD.

Back to top ^

Design Bid Build
Design Build
Phases
0.0 General
1.0 Predesign
2.0 Schematic Design
3.0 Design Development
4.0 Construction Documents
 
Information
CAD and Drafting Standards
DSC Workflows Definitions
Design Deliverables - Content and Format Requirements
Design Standards
DSC Technical Bulletins
Federal Acquisition Regulation (FAR)
Forms / Templates / Samples / Guidelines
Laws and Policies
Photo Gallery
Quality Assurance Guidelines
Workflow Diagram
What's New

Site Map | Contact | | Disclaimer | FOIA | US Department of Interior | USA.gov | ParkNet | DSC