3.1 Prepare Design Development
Documents
Based on the Schematic Design, and the Response Memorandum
to the DAB review questions, prepare the following:
Guidelines:
Template: Division
1 Specifications
|
|
 |
3.2 Initiate Constructability Analysis
Initiate Constructability
Analysis utilizing the Constructability Checklist.
Template: Constructability Checklist
|
|
 |
3.3. Draft Contract Price Schedule
Prepare a draft Contract Price Schedule utilizing the NPS DSC form.
Guideline: Guide for Specifiers, March 2008 (PDF)
Template: Contract Price Schedule
|
|
 |
3.4 Update Class B Construction
Cost Estimate
Update the Class
B Construction Cost Estimate based on the completed Design
Development documents; confirm that project cost is within
available funds.
|
|
 |
3.5 Design
Development Deliverables
|
| |
|
 |
3.5.1
|
Submit Draft Design Development
Documents
Submit Draft Design Development Documents, Constructability
Analysis, Draft Contract Price Schedule and updated Class B Construction Cost Estimate for review. |
| |
|
| |
3.5.2 |
Resolve Draft Design Development
Review Comments
Resolve all review comments. Submit written responses to review
comments, utilizing the NPS review form, within 15 calendar days
of receipt of comments.
|
|
 |
3.6 Compliance Deliverables
|
| |
|
 |
3.6.1
|
Compliance Drawings and Supporting
Narrative
|
| |
|
|
| |
|
3.6.1.1 |
When required, prepare and submit
drawings and supporting narrative for SHPO/THPO review and
other compliance activities, as required.
Incorporate resolution of SHPO/THPO review comments into Draft Design
Development Documents, as required.
|
| |
|
|
| |
|
3.6.1.2 |
When required, prepare and submit drawings and supporting
narrative for obtaining Section
404, National
Pollutant Discharge Elimination system (NPDES), and other permits
as required.
Resolve reviewing agencies comments, as required.
|
| |
|
| |
3.6.2 |
Submit FONSI or ROD
When required, submit FONSI or ROD.
Back to top ^ |