Landscape Architectural Quality Assurance Checklist

Predesign

Within Scope and Budget

NEPA/106 Compliance

LA Design Standards (Accessibility and Sustainability)

  • Accessibility issues identified, universal access incorporated
  • Proposed design adequately addresses site needs of PMIS project
  • Site analysis complete, supports proposed design
  • Site design utilizes previously disturbed areas (brownfields) before new sites developed
  • NPS Policies and Guidelines (NPS ethic)

    Coordination

    Completeness


    Schematic Design

    Scope and Budget

    NEPA/106 Compliance

    LA Design Standards (Accessibility and Sustainability)

    NPS Policies and Guidelines (NPS ethic)

    Completeness


    Design Development

    Within Scope and Budget

    NEPA/106 Compliance

    LA Design Standards (Sustainability, Accessibility)

    NPS Policies and Guidelines (NPS ethic)

    Coordination

    Completeness


    100% Draft Construction Documents or 100% Draft Design-Build Construction Documents

    Scope and Budget

    NEPA/106 Compliance

    LA Design Standards (Sustainability)

    NPS Policies and Guidelines (NPS ethic)

    Coordination

    Completeness (documents adequate to construct intended facility)


    Submit 100% Complete Construction Documents or 100% Complete Design-Build Construction Documents for Final Approval