Drafting Standards Quality Assurance Checklist
Design Development
NPS Guidelines
Files meet requirements of:
- Director’s Order 10A – (Guideline for Preparation Of Design and Construction Drawings
- Director’s Order 10B – (Drawing and Map Numbers Reference Manual)
- CADD User’s Guide – Denver Service Center
- Standard cover sheet with vicinty map used. Includes appropriate approval block/revision block
- Project number/solicitation number on cover
- Index matches sheet titles
- Legend- reflects only symbols used in the specific drawing set
- Abbreviation List - reflects only abbreviations used in the specific drawing set
- Project “bid options” are clearly called out and distinguishable from base bid
- Standard second sht/plan & profile sht. Title block contains title of sheet and includes the park name
- Do not “explode” or “burst” title blocks
- All drawings include a drawing tag that includes date/time of last save, user name, the AutoCAD release version, drawing path & filename, and xref list.
- All drawings drawn at true scale and true coordinates in model space.
- Topo in model space in “real world”-do not move or rotate topo in model space (if rotation is necessary, rotate in paper space viewport)
- Drawing names used as xrefs begin with an “x” and are located in the “bases” folder
- Preference is to “overlay” xrefs (don’t “attach” files, creating unnecessary xrefs in other drawings)
- Coordinate format in decimal feet to the hundredths
- No entities intended to be plotted are drawn with pen 8 or 9 (no plot pens)
- Scale bars- no “text scales” (text scale is not accurate when drawings are reduced)
- Dimension style is associative
- Hatch is associative (do not explode hatch)
- If “custom” hatch used – include hatch file
- Drawings reflecting existing conditions (screened pen) vs. new work (100% pens) is clearly distinguishable on plots
- Text- Drawing files use only romans.shx and arch.shx (all uppercase)
- Drawings (linework, text, symbols etc.) legible when printed half size.
- Drawings containing photos – When photos are inserted in drawings, the full-size reproducible must be capable of producing clear, legible half-size prints. In addition to the .jpg/.tif etc., submit a “hard copy” photo.
- When necessary, “mask” or clear behind text for clarity (within profile grid etc.)
- Existing conditions sheet- label survey control and a minimum of 3 labeled coordinate tics
- Demo items are not reflected on subsequent design subsheets (only shown on existing conditions sheet and demo sheet)
- Do not bind xrefs
- Use relative paths for xrefs
- Do not xref such items as scale bars/north arrows/std. details etc.
- Use only pens/color configuration as shown in figure 4-2 of cadd users guide. (Line widths are set at the plotter and not in the model)
- Drawings use color dependent plot styles, not named plot styles
- Create all objects “color by layer” only
- Project files comply with DSC folder structure, i.e. [park] \ [package or pmis] \ [phase] \ [discipline]
- Drawing filenames conform to the DSC drawing file naming conventions (CADD Users’s Guide)
- Each sub sheet is created as an individual .dwg file. (One single drawing file containing multiple subsheets is not acceptable)
- Printing/plotting set in paper space at 1:1 scale for full-size prints, 1:2 scale for half size prints.
- Rotate in paper space viewport- (do not rotate topo etc. in model space)
- Remove all extraneous graphics and drawing entities existing outside the drawing border in order that “extents” can be set for plotting
Completeness
- No drawing files accepted other than in AutoCADD format (.dwg). Other formats are not acceptable (.dxf/.dgn etc.)
- Deliverables– Files comply with no “old” or extraneous files included
- Required deliverables for each completed stage of a project are submitted for archiving (folder structure reflects specific stage of project)
- Deliverables meet Technical Information Center’s requirements for archiving
100% Draft Construction Documents or 100% Draft Design-Build Construction Documents
- All review comments from Design Development Review are satisfactorily
resolved
- Required deliverables submitted
Submit 100% Complete Construction Documents or 100% Complete Design-Build Construction Documents for Final Approval
- Required deliverables submitted
- All review comments from 100% Draft Review satisfactorily resolved
Construction Document Amendments
- Construction Drawing Amendments comply with “numbering” procedures contained in Director’s Order 10B (Reference Manual for Drawing and Map Numbers)
- Cover sheet revision block and drawing index reflect drawings changed
- Amendments to drawings are clearly defined by “clouding” or “keying”
- Required deliverables submitted
Construction Document Modifications
- Construction Drawing Modifications comply with “numbering” procedures contained in Director’s Order 10B (Reference Manual for Drawing and Map Numbers)
- Cover sheet revision block and drawing index reflect drawings modified
- Modifications to drawings are clearly defined by “clouding” or “keying”
- Required deliverables submitted
As-Constructed Drawings
- Required deliverables submitted