0.0 Historic Structure Report
square bullet

0.1 Preservation Imperatives

Utilize the following at all stages of Historic Structure Report preparation processes:

 
square bullet

0.2 Prepare Historic Structure Report Front Matter

 
  0.2.1

Prepare Cover Page

 
  0.2.2

Prepare Table of Contents

 
  0.2.3

Prepare Executive Summary

 
  0.2.4

Prepare Administrative Data


square bullet

1.0 Prepare Part 1 - Developmental History

 
 

1.1 Describe Historical Background and Context

 
 

1.2 Describe Chronology of Development and Use

 

1.3 Describe Physical Description

 

1.4 Describe Character Defining Features

 
 

1.5 Prepare Condition Assessments


2.0 Prepare Part 2 - Evaluate Treatment and Use
 
 

2.1 Discuss and Analyze Ultimate Treatment and Use

 
  2.2 Specify Requirements for Treatment
 
  2.3 Specify Alternatives for Treatment
 
  2.4 Specify Assessment of Effect for Recommended Treatments

Back to top ^


3.0 Prepare Part 3 - Record of Treatment
(Prepared during and After Treatment)

 
 

3.1 Summarize the Following

  • The intent of the work
  • The way is which the work was approached and accomplished
  • The time required to do the work
  • The cost of the work
  • Describe any information about the history of the structure based on physical evidence discovered during construction
 
 

3.2 Include Technical Data

  • Copies of the field reports
  • Material data sheets
  • Field notes
  • Correspondence
  • Accounting
  • Spreadsheets
  • Contract summaries

4.0 Prepare Appendicies

 
  4.1 Prepare Bibliography
 
  4.2 Prepare and Insert Photographs
 
 

4.3 Prepare and Insert Drawings

 
  4.4 Insert Historical Documents
 
  4.5 Insert Historic Materials Analysis
 
  4.6 Insert Supplementary Reports

square bullet

5.0 Deliverables

  • Historic Structure Report Front Matter
  • Part 1 - Developmental History
  • Part 2 - Evaluate Treatment and Use
  • Record of Treatment
  • Appendix
 
 

5.1 Submit 100% Draft HistoricStructure Report for Review

Submit the following 100% Draft Historic Structure Report for review:

  • Front Matter
  • Part 1 - Developmental History
  • Part 2 - Treatment and Use
  • Record of Treatment
  • Appendix
 
 

5.2 Resolve Historic Structure Report Comments and Submit Final Historic Structure Report for final approval

Resolve all review comments and incorporate resolutions into the final Historic Structure Report document. Submit 3 copies of the final Historic Structure Report document and written responses to review comments, utilizing the NPS review form, within 15 calendar days of receipt of comments.

 
 

5.3 Submit Final Historic Structure Report

Upon final approval of documents submitted in Paragraph 4.2, submit two electronic copies and 35 hard copies of the final Historic Structure Report.

Back to top ^

 
Cultural Landscape Report
Historic Structure Report
 
Work Elements
0.1 Preservation Imperatives
0.2 Prepare Historic Structure Report
Front Matter
1.0 Prepare Part 1
2.0 Prepare Part 2
3.0 Prepare Part 3
4.0 Prepare Appendices
5.0 Deliverables
 
Information
CAD and Drafting Standards
DSC Workflows Definitions
Editing Reference Manual
HSR Deliverables
HSR Standards
Forms / Templates / Samples / Guidelines
Laws and Policies
Photo Gallery
<empty> What's New

Site Map | Contact | | Disclaimer | FOIA | US Department of Interior | USA.gov | ParkNet | DSC